A Civil Engineer

Be a Construction Expert

  • Home
  • Start here
  • About
  • Advertise
  • Contact

9 Things to Check in RCC False Slab Before Casting

10/08/2018 By Liton Biswas 2 Comments

Things to Check Before Casting RCC False Slabs in Bathrooms

RCC false slab is a slab which we make below or above the main floor slab. There are various purposes of making false slabs. Some false slabs are made for the interior purpose. Some are made for hiding air conditioning ducts. Some are made for hiding any unwanted things. I’m talking about the false slab […]

Filed Under: Construction Process Tagged With: RCC, slab

How to Make RCC False Slab in Bathrooms

03/08/2018 By Liton Biswas Leave a Comment

Construction Process of RCC False Slab

There must be some sanitary and water supply pipes in bathrooms. If those pipes remain to expose it will look ugly and decrease the aesthetic look of bathrooms. To overcome this unwanted thing we need to cover those pipes. To cover those pipes, we need to make false slab in bathrooms.   What is a […]

Filed Under: Construction Process Tagged With: slab, Super Structure

10 Things to Check Before Tilling your Bathrooms

15/06/2018 By Liton Biswas 17 Comments

10 Things to Check Before Tilling Your Bathrooms

Updated February 2nd, 2019 Nowadays, you’ll see tiles on walls and floor of almost all bathrooms in a building. It’s now a common practice to tile on bathroom walls and floor. After completing the wall making on a floor, you may want to go for tiles work in bathrooms of your building construction project. But, […]

Filed Under: Construction Process Tagged With: Masonry work, Tiles Work

How to Calculate Concrete Quantity for Neck Column

08/06/2018 By Liton Biswas 1 Comment

Easy Way to Calculate Concrete Quantity for Neck Column

Updated February 3rd, 2019 Either you are going to use ready-mix concrete or on-site machine mix concrete, you need to calculate the concrete quantity of neck columns for ordering ready-mix concrete or purchasing concrete ingredients. It is our common practice. We often calculate concrete quantity before going to cast any concreting members. There are many […]

Filed Under: Estimating Tips Tagged With: Column, Concrete, substructure

How to Easily Estimate Shuttering Materials for Footing

25/05/2018 By Liton Biswas 23 Comments

How to Easily Estimate Shuttering Materials for Footing

Before estimating shuttering materials for footing you need to check the availability of shuttering materials in your project. If you built any other building before you may have some shuttering materials there which you can use in your current project. The purpose of this is to reduce costs as this is the major concern in […]

Filed Under: Estimating Tips Tagged With: Foundation, substructure

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • …
  • 36
  • Next Page »

Subscribe

Subscribe to our newsletter and get a free "estimating Cheat Sheet"




Categories

  • Building
  • Building Materials
  • Concrete Technology
  • Construction
  • Construction Process
  • Construction Safety
  • Construction Tutorial
  • Estimating Tips
  • Geotechnical Engineering
  • How to Guide
  • Interior
  • Project Management
  • Reinforced Cement Concrete

Recent Posts

  • What is An Isolated Footing?
  • Properties of Hardened Concrete
  • Plain Cement Concrete – How to Produce and Construct
  • How to Calculate Materials For Different Ratio Concrete
  • Types Of Plaster In Building Construction
  • Defects in Plastering: Causes and How to Fix Them
  • How to Calculate the Unit Weight of Steel Bars

© 2019. A Civil Engineer . Privacy Policy